Skip to content

Delivery

Windhoek does not have a dedicated Delivery frequency, as such all Delivery responsibilities are assumed by Windhoek Tower (FYWH_TWR). Under no circumstances should a FYWH_DEL position ever be opened without prior approval from staff.

Departure Procedures

Pilots shall be issued one of the departures when flying out of Windhoek. This process is done automatically through the vSID plugin on EuroScope.

Runway 08

Fix Procedure
EGMAS EGMAS1A
UVORI UVORI1A

Runway 26

Fix Procedure & Transition
EGMAS EGMAS1B
UVORI UVORI1B

Initial Climb

At Windhoek there is 10000ft

Phraseology

"Delivery Phraseology"

"(Callsign), cleared to (destination), flight planned route, via the (SID) departure, climb to 10000ft, passing 8000ft contact Windhoek Approach on 120.500, Squawk (squawk)."